How do you run the first construction site meeting? In this episode of What the RFI?, Matt Brennan explains how Architects, Contract Administrators, Project Managers, Engineers, Owners, and General Contractors can prepare for and lead a successful First Site Meeting.
The kickoff meeting is one of the most important milestones in Construction Administration. It establishes expectations, communication procedures, documentation requirements, project schedules, and responsibilities before construction begins. A well-organized first site meeting helps prevent misunderstandings, reduces project risk, and creates a strong foundation for a successful project.
In this episode, you’ll learn how to prepare your agenda, determine who should attend, review contracts and permits, discuss project schedules, establish communication protocols, coordinate shop drawings and RFIs, manage Site Instructions and Change Orders, review testing and inspections, and even begin planning for project close-out on day one.
Whether you’re new to Construction Administration or have years of experience managing construction projects, these practical tips can be applied to virtually any project.
This episode completes our three-part series on construction meetings.
⸻
Continue the Construction Meeting Series
🎙️ Episode 42 – Granola AI Review
The best AI note taker for Construction Administration?
https://youtu.be/6d4UR3qOczA?si=vAsiTjk5FDEJpo5Y
🎙️ Episode 43 – How to Run a Site Meeting
Learn how to organize and document productive construction site meetings.
https://youtu.be/iTSQyA7FECo?si=Bhvm6akefApBemnM
⸻
What You’ll Learn
- Why the First Site Meeting is critical to project success
- Preparing your kickoff meeting agenda
- Who should attend the first site meeting
- Reviewing contracts, permits, insurance, and project documentation
- Establishing communication protocols
- Site safety requirements and logistics
- Managing project schedules and milestones
- Shop Drawings, RFIs, Site Instructions, and Change Orders
- Testing, inspections, and quality control
- Progress claims and the Schedule of Values
- Why project close-out planning begins on Day One
⸻
Chapters
- 00:00 – Introduction
- 01:45 – Why the First Site Meeting Matters
- 05:20 – Preparing Before the Meeting
- 10:10 – Who Should Attend
- 15:35 – Project Documentation & Communication
- 22:15 – Site Safety & Site Logistics
- 29:40 – Project Schedule & Milestones
- 35:20 – Shop Drawings, RFIs & Site Instructions
- 43:30 – Testing, Inspections & Quality Control
- 50:40 – Progress Claims & Schedule of Values
- 56:45 – Planning for Project Close-Out
- 1:00:30 – Final Thoughts
⸻
Subscribe for weekly episodes covering Construction Administration, Contract Administration, CCDC Contracts, RFIs, Shop Drawings, Site Instructions, Change Orders, Project Close-Out, and practical advice for Architects, Contract Administrators, Engineers, and Construction Professionals.
🎙️Website - WhattheRFI.com
🍏Apple Podcast - What the RFI?
🎧Spotify - What the RFI?
🎥YouTube - @WhatTheRFI
<b>The tender has closed, the contract has</b><b>been awarded, and it's time</b><b>for your first construction</b><b>meeting.</b><b>Let's get into it.</b><b>Welcome to What the RFI.</b><b>I'm Matt Brennan, and this</b><b>is the podcast all about CA.</b><b>So the tender is closed, the contract's</b><b>awarded, and it's time to</b><b>kick off your first site</b><b>meeting.</b><b>All right?</b><b>This is exciting times.</b><b>You're proud.</b><b>You took it from design to this point.</b><b>And before we get into the details of it,</b><b>this is kind of concluding our three-part</b><b>series of how to run a construction site</b><b>meeting, how to use AI</b><b>note takers, and again, today</b><b>is about running that very first meeting.</b><b>We're going to dive into the details</b><b>because it's much</b><b>different than any other meeting</b><b>from meeting two to meeting number 50.</b><b>And if you missed those,</b><b>they will be in the links below.</b><b>They'll be up here.</b><b>Check out last week's last episode,</b><b>which, like I said,</b><b>talks about running your site</b><b>meetings.</b><b>And then the other video was about AI</b><b>note takers and the link above as well.</b><b>And in the description, take a look</b><b>because, again, these three</b><b>shows kind of back to back</b><b>will really basically put you right foot</b><b>forward and get going</b><b>with these site meetings.</b><b>OK?</b><b>And again, this one, I'm</b><b>going to share my screen.</b><b>So I encourage you to check out the</b><b>YouTube, what the RFI</b><b>channel like, subscribe, all</b><b>those good things, but lots of benefits.</b><b>But again, I'll be describing it</b><b>throughout the video and</b><b>you can probably just listen</b><b>on its own.</b><b>So let's just set the scene here.</b><b>OK, the tender is officially closed.</b><b>Bids have come in and</b><b>maybe it's a public opening.</b><b>We open up all the tender bits.</b><b>We go through it.</b><b>We check that all the</b><b>items were actually filled out.</b><b>And that's an episode by itself.</b><b>But in the end, we've reviewed the bids.</b><b>We've basically provided a letter of</b><b>recommendation to the</b><b>owner saying we suggest this</b><b>contractor to move forward.</b><b>And at that point, we'll give the</b><b>contractor a call,</b><b>celebrate, crack open champagne.</b><b>Congratulations.</b><b>Welcome to the team.</b><b>Now it's down to business.</b><b>And what I mean by that is we're going to</b><b>set up our first site meeting.</b><b>We're going to schedule it in the</b><b>calendar, see what works, see where</b><b>they're out on site,</b><b>how long they're</b><b>going to take to mobilize.</b><b>If they're not ready, then we will meet</b><b>most likely in the</b><b>owner's office, the architect's</b><b>office, maybe one in the</b><b>consultant's office, whatever.</b><b>We're going to find a good common place</b><b>to have the initial</b><b>kickoff meeting if the site</b><b>is not mobilized, which</b><b>chances are they won't be.</b><b>OK, and before we head off to that</b><b>meeting, one thing we</b><b>definitely want to do is create</b><b>an agenda. And we talked about this in</b><b>the last episode, preparing for it.</b><b>We will email this in advance of it.</b><b>We'll talk to the owner if</b><b>there's any general items.</b><b>This is more like I</b><b>said, it's a kickoff meeting.</b><b>So there is certain things and we're</b><b>going to dive into it in a moment here.</b><b>OK, and always again, I love my software</b><b>and, you know, for</b><b>software to run this again,</b><b>usually we're just using Microsoft Word</b><b>because it's a great meeting note tool.</b><b>As noted in my kind of first episode of</b><b>this series is we use</b><b>granola AI and we run it just</b><b>to capture any notes that</b><b>we miss during the typing it.</b><b>But definitely, again, bring</b><b>your laptop to that meeting.</b><b>Do your meeting notes right there in as</b><b>we go through the site meeting there.</b><b>A lot of power for power advantage to it</b><b>and then we can get it out.</b><b>So the meeting has started.</b><b>We've got our agenda open.</b><b>And again, I can note it.</b><b>Email this advanced to everybody.</b><b>OK, in part of this</b><b>template, we've got our branding.</b><b>We've got our project name with site</b><b>meeting number one</b><b>agenda, which once we take this,</b><b>we're going to change</b><b>that to notes and record it.</b><b>Our project number, the time it started,</b><b>the location and of course, the date.</b><b>Now, just like as we showed in the last</b><b>episode there, we do want</b><b>to do attendance, want to</b><b>make sure and being a site kickoff</b><b>meeting, everyone's going to be here.</b><b>We're going to have, you know, the owner,</b><b>of course, the contractor.</b><b>We've got what the RFI team, the CRP, the</b><b>architect record there.</b><b>We've got Pam from B civil engineering</b><b>structures, you know,</b><b>mechanical, the whole team, even</b><b>landscapes here.</b><b>And at that point, I know they're not</b><b>involved really much as we</b><b>get in the project, but again,</b><b>it's just this is our kickoff.</b><b>We want everyone there and</b><b>it'd be nice just to do that.</b><b>And away we go.</b><b>In this, of course, we've got their</b><b>initials for the company.</b><b>This is really important addressing to</b><b>who the action items belong to.</b><b>And then, of course, all we would have</b><b>all the emails listed out.</b><b>If anyone needs to get in touch with</b><b>everyone, they know who they are.</b><b>So the first topic of is</b><b>the general discussion.</b><b>So ideally, let's do</b><b>an introduction to team.</b><b>Probably these are the</b><b>same consultants working with.</b><b>Maybe there's the one lone wolf that has</b><b>never worked with anyway.</b><b>No worries.</b><b>Great introduction.</b><b>Get it all out there.</b><b>In addition to this, what the RFI has</b><b>provided a centralized</b><b>OneDrive Dropbox or Google Drive,</b><b>whatever, for of all the project folders,</b><b>this would be IFT, IFC.</b><b>If the issue for construction drawings</b><b>haven't been issued, this would be a</b><b>great time to bring it up.</b><b>Note when they're going to come and when</b><b>they're being prepared and</b><b>when they can go to the printers</b><b>for site and away they go.</b><b>Just in terms of protocol, I like to note</b><b>that all communication to</b><b>flow through what they RFI,</b><b>in this case, and we should</b><b>be CC'd on all correspondence.</b><b>If any of these emails start going just</b><b>directly to the consultants or not CC'd,</b><b>we're the CRP.</b><b>It's nice just having</b><b>an idea what's going on.</b><b>We don't need to be a gatekeeper, a</b><b>bottleneck in that sense,</b><b>but we should be in the know.</b><b>So that's just one element in respect to</b><b>that we should have it.</b><b>Okay.</b><b>Definitely again, in response to</b><b>communication, emails should include the</b><b>name, school project.</b><b>I hate getting emails where it's just</b><b>like anchor bolts or steel shop drawings.</b><b>Great.</b><b>What job is this for?</b><b>I probably know it would be based on the</b><b>contractor, but I work with some</b><b>contractors from the same company.</b><b>And again, it's just</b><b>easy just to kind of do it.</b><b>Now, if there's any kind of outstanding</b><b>building permits or post-tenure denims,</b><b>as I know to the IFC documents, this is a</b><b>good time to bring it up.</b><b>Where are we at?</b><b>Yeah, building permits been complete.</b><b>Owner has it in hand.</b><b>He's going to deliver it</b><b>over to the contractor.</b><b>Great.</b><b>Little things like that.</b><b>The actual physical contract between the</b><b>owner and the contractor,</b><b>that's where we</b><b>should know where we're at.</b><b>What stage is it?</b><b>Being finalized?</b><b>This takes time.</b><b>Again, it's just something nice to</b><b>document in this kind of</b><b>general conditions area.</b><b>The next one, we're going to get into</b><b>site safety, security,</b><b>and users and the facility.</b><b>So this is all about safety, right?</b><b>Where are we going to bring into us?</b><b>So of course, at the first time of</b><b>arriving to the actual physical site,</b><b>we're going to talk about, you know,</b><b>users going to sign in and out,</b><b>sign in and out of the trailer.</b><b>In addition to that, what do we need to</b><b>do for an orientation?</b><b>Maybe this is</b><b>something we can do in advance.</b><b>Watch a video from provided by the</b><b>contractor, fill out a</b><b>form, bring that form with us.</b><b>Do we have to sit in the site orientation</b><b>as we arrive on site?</b><b>This is where the contractor is going to</b><b>tell us exactly how,</b><b>if you want to come on to RSA, you've got</b><b>to obey by these rules.</b><b>So these are the kind of what we're going</b><b>to be talking about in this section.</b><b>Risk management, they'll</b><b>have a physical report.</b><b>This is something that your owner is</b><b>going to want to see,</b><b>especially like I do a lot of schools.</b><b>We want to know how this is playing out</b><b>with the risk management side,</b><b>you know, the chainline</b><b>fencing, the security fencing,</b><b>operation hours, all</b><b>those kind of things.</b><b>And this kind of dies into</b><b>the contractor safety manual.</b><b>Again, that's going to know their muster</b><b>locations, you know,</b><b>where their first eight locations are to</b><b>be located about it.</b><b>It's just all those details that are</b><b>coming directly from the contractor.</b><b>And it's just taking a note.</b><b>Is the manual being prepared?</b><b>Is it being delivered?</b><b>And as we're going</b><b>through the site meeting,</b><b>I would, you know, make my general</b><b>comments and add to these notes.</b><b>So this is all pre-filled out.</b><b>And now I'm just adding</b><b>what we discuss in the meeting.</b><b>Site cleanliness, maybe the school</b><b>district has some</b><b>protocols with it in that respect.</b><b>We'll talk about temporary site fencing.</b><b>Typically, that probably is noted on your</b><b>phasing plan that was provided</b><b>or kind of a construction safety plan</b><b>that was provided in the tender docs.</b><b>Whatever the case is, we have a specific</b><b>line item just to</b><b>talk about in that sense.</b><b>On-site security during construction, 24</b><b>hour contact number.</b><b>Who's really leading this project?</b><b>Who wants to give out their cell phone</b><b>during this meeting?</b><b>It's Jeff from site.</b><b>Great, you know, great time to, you know,</b><b>disclose contact</b><b>numbers if anything comes out.</b><b>And is there going to be</b><b>site security 24 hours, right?</b><b>When sites shuts down, do they have</b><b>cameras, do they have monitoring systems?</b><b>It's all good</b><b>information just for records.</b><b>It may raise some questions.</b><b>The owner may say, well,</b><b>that's not going to happen.</b><b>Or like if there is security cameras, are</b><b>they pointing to the existing school?</b><b>Because this is important, right?</b><b>So all these little details were hashing</b><b>out in this initial kickoff meeting.</b><b>Okay.</b><b>Vehicle access.</b><b>Where are we entering onto the site?</b><b>Maybe you did a phasing plan to show the</b><b>construction access</b><b>and the phasing between</b><b>all of the different, you know,</b><b>complicated phases of an</b><b>existing building with a new</b><b>and then the teardown of the old or</b><b>whatever the case is.</b><b>Where are we providing access?</b><b>We most likely already know this.</b><b>The contractor may have some comments,</b><b>whatever the case is.</b><b>This is a great idea,</b><b>great moment to talk about it.</b><b>The next one, we've</b><b>got the safety issues.</b><b>Responsibility of the contractor, safety</b><b>plans, work safe, BC.</b><b>Depending who you are, there's probably</b><b>some general guidelines</b><b>based on the state you're in.</b><b>So these are all, you know, things just</b><b>to bring up, talk about,</b><b>low kind of priority items.</b><b>But again, it's just good to talk about.</b><b>The temporary office.</b><b>So when is the offices</b><b>starting to be arriving on site?</b><b>When are they mobilizing?</b><b>Note this, right?</b><b>Bring this into the agenda,</b><b>talk about it and find out.</b><b>Are they mobilizing right away?</b><b>If they're not, then why not?</b><b>You've got a beautiful summer right now.</b><b>Why aren't you taking advantage of it?</b><b>All these things that you can start to</b><b>help provide and keep moving.</b><b>Sanritay facilities.</b><b>And again, based on the state and what</b><b>the governing rules are,</b><b>depends on the size of project, we</b><b>actually require</b><b>physical flush toilets in that.</b><b>So again, that may be</b><b>something that we'd be expecting.</b><b>Maybe it's just general porta-potties.</b><b>Temporary powers</b><b>written in our specifications.</b><b>No one is coming from the contractor.</b><b>Will there be internet at the trailer?</b><b>It should be.</b><b>We know it in our specs because we want</b><b>to have internet to</b><b>run our site meetings,</b><b>connect by hybrid options if we've got</b><b>someone that can't make to the meeting,</b><b>but they can be by Zoom,</b><b>Teams, whatever the case.</b><b>Fantastic.</b><b>That's a great way to do.</b><b>We'll talk about maybe having a big</b><b>screen TV in their site trailer,</b><b>bring up the drawings.</b><b>It's very helpful.</b><b>Ties into the Teams thing</b><b>that we just talked about.</b><b>And temporary water,</b><b>temporary gas, and again,</b><b>what the general construction hours.</b><b>We're talking about the operations that</b><b>the contractor's doing.</b><b>So we're asking the questions.</b><b>Contractors telling us we're filling in</b><b>this agenda and noting it</b><b>just as a kind of a contractual document</b><b>for records going forwards.</b><b>And then we get into the</b><b>operations aspect of it.</b><b>That's where we've got noisy work.</b><b>So again, there's certain bylaws.</b><b>Maybe they have to abide</b><b>by road cleaning and dust.</b><b>Again, the bylaws are</b><b>going to dictate that.</b><b>For school sites, absolutely</b><b>no smoking or vaping on site.</b><b>So if they want to do that, they've got</b><b>to go down the block</b><b>and do it in the neighborhood</b><b>or wherever they want to do it.</b><b>So again, maybe this is not applicable.</b><b>Great. No problem.</b><b>Ideally, all contractors</b><b>have business licenses.</b><b>Pretty straightforward.</b><b>Another one, criminal record checks.</b><b>Was this part of your tender?</b><b>Did you say to the</b><b>contractor every sub trade</b><b>had to have a criminal record check?</b><b>That's up to you.</b><b>This is stuff that you need to lay out in</b><b>those tender documents</b><b>that come into effect here.</b><b>And this is just a triple check that</b><b>we're going to be getting in that.</b><b>Because again, we've had problems with</b><b>individuals coming to site</b><b>and they did have a criminal record.</b><b>And it was a problem between</b><b>the owner and the contractor.</b><b>And thankfully, we had</b><b>it in the tender documents</b><b>saying criminal</b><b>records had to be correct.</b><b>So this is just a triple check to make</b><b>sure that we're doing everything.</b><b>Now we're getting into the actual</b><b>construction side of things.</b><b>So let's talk about the building permit.</b><b>Building has been received</b><b>from the city of Bernabé.</b><b>Actually, it hasn't, right?</b><b>We got issues where,</b><b>when's it going to come?</b><b>This is an immediate red flag.</b><b>If you don't have that</b><b>building permit in hand,</b><b>unless you got an agreement</b><b>with the city or a temporary</b><b>or a foundation permit</b><b>or something like that,</b><b>this can cause a lot of problems.</b><b>This could be your first delay.</b><b>I don't know.</b><b>We'll see.</b><b>This is the first SEO because of it.</b><b>In this case, typically, we have that</b><b>building permit at the meeting.</b><b>We're going to pass it over to the</b><b>contractor and away we go.</b><b>And what items need to be</b><b>provided by the contractor?</b><b>Well, part of the building permit, we</b><b>need damage deposits.</b><b>We need a disposal of</b><b>excavation materials form.</b><b>There may be some form work that has to</b><b>be filled and submitted</b><b>to that city that you're</b><b>in, where this project is.</b><b>Maybe pre-damage on site</b><b>meetings have to take place.</b><b>Your ESC plan showing</b><b>for erosion settlement,</b><b>control plans, and where you're noting</b><b>that goes into play.</b><b>The city is going to be</b><b>involved with this, right?</b><b>And they'll take your</b><b>plans and work with it.</b><b>The coordination from the</b><b>city for all the inspections</b><b>is responsive to the contractor.</b><b>But again, this is just raising it up.</b><b>The next section we</b><b>get into is some middles.</b><b>So project construction schedule.</b><b>I'd like to see a</b><b>construction schedule right now.</b><b>We know in your tender</b><b>bid that you noted 141 weeks</b><b>from the project start date, we get that.</b><b>But we want to see an</b><b>actual physical breakout</b><b>of the construction schedule now.</b><b>Shop drawing schedule would be nice in</b><b>the cashflow, right?</b><b>We want to go through all these details.</b><b>We want to expect one</b><b>to see our shop drawings.</b><b>We want to see kind of like</b><b>a typical progress draw claim</b><b>because we're going to start getting</b><b>those every single month.</b><b>Performance bonds, right?</b><b>All your bonding that ties</b><b>into your insurance as well.</b><b>All this information needs to be provided</b><b>from the contractor.</b><b>On both ends and the owners as well.</b><b>So because they'll have their</b><b>insurance here on their land</b><b>and vice versa, and</b><b>you'll have your insurance</b><b>and all the legalities.</b><b>But at least we're covering it.</b><b>We're just bringing it up.</b><b>And as we if these items</b><b>have already been done,</b><b>check, check, check,</b><b>then note it's been done.</b><b>It's closed, closed, closed.</b><b>A lot of these items</b><b>should be info only or closed.</b><b>And a few items are going to</b><b>travel over to the next agenda.</b><b>Okay.</b><b>Schedule of values.</b><b>So again, based on all the consultants,</b><b>list of sub trades, the</b><b>subcontractors typically required</b><b>that for part of our tender package.</b><b>Again, we just want to know who's going</b><b>to be performing the work.</b><b>Then we get into the</b><b>engineering side of things.</b><b>So we've got the surveying.</b><b>So we've got our survey</b><b>of the original property.</b><b>Of course, the contractor is</b><b>going to get their own surveyor.</b><b>They'll compare notes, make sure</b><b>everything's aligned.</b><b>I had one job recently come out from</b><b>tender into construction.</b><b>And there was some</b><b>minor, minor discrepancies out</b><b>by a couple inches on the property lines.</b><b>We cleaned it up.</b><b>Everything was good.</b><b>No issues.</b><b>Away we go.</b><b>But still, thank you for checking from</b><b>the contractor side.</b><b>And it's all good.</b><b>The geotech.</b><b>The first thing that we start off with is</b><b>digging in the ground.</b><b>And sometimes we find</b><b>some unfortunate things.</b><b>Maybe this was a fill</b><b>site, maybe some bad soils,</b><b>even though we did</b><b>everything we could from the geotech</b><b>and provided stripping plans.</b><b>Sometimes you just don't know.</b><b>Right.</b><b>This is an episode on its own.</b><b>We definitely will cover</b><b>this in the future podcast.</b><b>But having your geotech right there,</b><b>give us an idea what to</b><b>expect right at the beginning.</b><b>Really good information.</b><b>Compaction and concrete testing.</b><b>These are things that are going to come.</b><b>Is the contractor out to</b><b>select who they're going to do</b><b>for the testing agencies or</b><b>is it going to be the owner?</b><b>Is it part of the specs?</b><b>That's something that will</b><b>be discussed at this point.</b><b>They may say, we work with these groups.</b><b>Yeah, we worked with them as well.</b><b>We're happy.</b><b>Proceed.</b><b>Again, have the conversation</b><b>now so we can just get it out</b><b>and get it done.</b><b>And the next kind of</b><b>subsection is the site meeting.</b><b>So ideally we do a once a</b><b>month site meeting on site.</b><b>Everyone should be on site.</b><b>Again, the hybrid's there.</b><b>It's fantastic.</b><b>But again, at the</b><b>beginning of the project,</b><b>you're going to need your mechanic.</b><b>You need your civil.</b><b>You need your electrical.</b><b>You certainly need structural landscape.</b><b>They're the only one</b><b>that's going to be excused.</b><b>We definitely want the</b><b>geo at the beginning of it.</b><b>Eventually the geo will,</b><b>once we've brought</b><b>everything back up to grade</b><b>and the foundations are done</b><b>and the soils have been</b><b>excavated and all that.</b><b>Once all that was worked down, then yeah,</b><b>the geo can be excused.</b><b>But in the meantime, they</b><b>need to be at that meeting.</b><b>So good things to point out.</b><b>Now, depending on how the meetings are,</b><b>sometimes we do a biweekly</b><b>every second week on teams.</b><b>That's the one time.</b><b>If, because maybe it is a</b><b>bit of a distance to travel</b><b>and it doesn't help.</b><b>It does help.</b><b>It lets us keep RFI's and submittals</b><b>and everything on track.</b><b>Again, at the beginning of</b><b>the project, it's always fun.</b><b>There's lots, again, what</b><b>are we finding with soils?</b><b>So maybe we do want to</b><b>connect a little bit more</b><b>and just keep on track</b><b>and it's probably good.</b><b>At these site meetings, again,</b><b>as I noted in the last video,</b><b>I like to note, I like to be the one,</b><b>the CRP on record to</b><b>run the site meetings.</b><b>So we take the notes,</b><b>participants are encouraged</b><b>to do their own notes, of course,</b><b>and any unscheduled meetings to be</b><b>coordinated by others.</b><b>Once we do the notes, we</b><b>distribute them right away</b><b>and get them out.</b><b>Progress claim.</b><b>This is all about kind of each month</b><b>as we get that</b><b>progress claim submitted to us</b><b>by the contractor,</b><b>showing what the status</b><b>of where things are moving forward</b><b>and what their billings and everything.</b><b>We like to see a draft</b><b>progress claim from them.</b><b>We like to go through it and</b><b>just see how it fits through.</b><b>Is there some sections that we want</b><b>broken out by detail more?</b><b>It's a good three, four page document</b><b>that we definitely are</b><b>going to be looking after</b><b>over the next kind of two to three years.</b><b>So we want to make sure</b><b>that we're comfortable</b><b>with the way it's broken down</b><b>and all the consultants will review this</b><b>and get that in place.</b><b>Any stat decks,</b><b>statutory decoration required</b><b>for second and further claims.</b><b>Again, this all ties into the</b><b>physical contract in itself.</b><b>And then we've got the</b><b>request for takeover.</b><b>Before we called it substantial,</b><b>this is something the CCDC2 language</b><b>has recently changed.</b><b>So now it's request for takeover, right?</b><b>Basically, request for</b><b>takeover from the owner</b><b>handed off by the contractor.</b><b>So ideally we've got a</b><b>whole procedures list</b><b>that we actually include in our specs.</b><b>It's a very detailed, break out list</b><b>to ensure that nothing's missed.</b><b>And we're not on that</b><b>day of doing an S-1001</b><b>or a fire alarm verification testing.</b><b>And we're going, "Oh,</b><b>where's this document?"</b><b>It's a nice way of just</b><b>showing all the procedures.</b><b>And honestly, this</b><b>procedure start to really,</b><b>like we start to jump</b><b>in three, four months</b><b>in advance of the project closing</b><b>because we don't want to</b><b>wait till the last minute.</b><b>We want to get things moving.</b><b>It takes time to get documents.</b><b>And next thing you know it,</b><b>we're at that day where they</b><b>want to call for an occupancy</b><b>and we've only got half</b><b>the documents in there</b><b>before we got to push it off.</b><b>So let's be proactive, right?</b><b>And this is kind of just</b><b>talking about that procedures</b><b>in that respect.</b><b>We talked about the list of deficiencies</b><b>and the values on the list</b><b>and how we're going to handle this</b><b>that request for takeover.</b><b>One thing we don't want to</b><b>be called to early, right?</b><b>We don't want any of our team, the</b><b>architect and record</b><b>to be called out to</b><b>site and look at something</b><b>where we don't need to</b><b>make a deficiency list</b><b>where this wall is not painted.</b><b>We want to come up when you</b><b>feel it's completely done.</b><b>You've bettered out,</b><b>you've gone through everything</b><b>and you're ready to go.</b><b>The owners, operations, manuals, O&Ms,</b><b>we want and record drawings,</b><b>just how we're going to handle that.</b><b>Expect to see those again</b><b>at the end of the project.</b><b>But again, it's just a</b><b>discussion point for that.</b><b>Next, we're going to</b><b>move into the field reviews.</b><b>This is where we do want to</b><b>talk about our consultants</b><b>to take ownership,</b><b>issue their field</b><b>reviews to the contractor, CCS.</b><b>So we've got a record copy of course,</b><b>make sure it goes to the contractor</b><b>so they can follow up</b><b>on any deficiencies.</b><b>And we certainly have a minimum.</b><b>We want to be notified advanced.</b><b>For example, we bring this one up</b><b>and make it very clear is do</b><b>not pour that concrete slab</b><b>until we've reviewed the</b><b>poly and the slab on gray,</b><b>the vapor bearers,</b><b>all that kind of stuff.</b><b>We want to see it.</b><b>Before you backfill,</b><b>I want to make sure there's</b><b>foundation insulation there.</b><b>These are things I want to take a look.</b><b>Before you start boarding, I</b><b>want to see the fire stopping.</b><b>Very important to hammer in.</b><b>Do not go ahead, do not pass go</b><b>let me come to site and</b><b>inspect it to make sure.</b><b>Because once everything's covered up,</b><b>it's much difficult.</b><b>And yes, they can send out photos.</b><b>And if you're okay with that, go for it.</b><b>No problem.</b><b>But ideally, we should have this clarity</b><b>right from the beginning.</b><b>And the list just goes on, right?</b><b>And that kind of stuff.</b><b>And consultant reviews, same thing.</b><b>We're just have a kind of brief</b><b>conversation about this,</b><b>what to expect from it.</b><b>You get the gist of it.</b><b>And now we kind of move</b><b>into the general meeting notes,</b><b>agenda items that we kind of we're going</b><b>to start to talk over and over.</b><b>So this was kind of the</b><b>front end, we deal with it.</b><b>And really it</b><b>disappears after this meeting.</b><b>Any of those kind of</b><b>items that we talked about</b><b>are the general conditions awaiting this.</b><b>I would probably just move</b><b>that into a general call.</b><b>Maybe it moves into the schedule column.</b><b>And maybe it's a shop during night, or</b><b>maybe it comes into there.</b><b>So we kind of reshuffle them.</b><b>We delete the majority of those sections</b><b>that we just talked about.</b><b>Now our site meeting</b><b>really starts to kick off.</b><b>Schedule, Fort Wico, look,</b><b>what do you got contractor?</b><b>We're mobilizing a site.</b><b>We're getting a survey out there.</b><b>That's what we're expecting.</b><b>We're going to bring our excavators and</b><b>we're going to start digging.</b><b>Great.</b><b>Noted in your meeting notes.</b><b>Way you go.</b><b>And as I talked in the last video, I like</b><b>to track the utilities.</b><b>So we've got BC Hydro here</b><b>who handles all electricity.</b><b>And then we've got Fortis Gas.</b><b>And sometimes we actually got</b><b>communications through TELUS,</b><b>Rogers, FIDO, or Verizon,</b><b>or whatever the case is.</b><b>That's where we want to</b><b>note those individuals</b><b>that are going to be installing that.</b><b>And this is good just to keep on track.</b><b>I don't know this every single meeting,</b><b>unless there's a drastic change.</b><b>Target date is</b><b>October, 2026 for the install.</b><b>Great note.</b><b>If it changes, that's fine.</b><b>But we want to track at each meeting.</b><b>And just make sure</b><b>that we're not off track.</b><b>If we're off track,</b><b>then we're in problems,</b><b>and then we want to record it and know</b><b>why and how did it get off there.</b><b>So those are kind of</b><b>high level schedule items.</b><b>We'll move into shop drawings.</b><b>Again, just protocol.</b><b>All the shop drawings submit.</b><b>Shop drawings be emailed.</b><b>The consultants are to be CC'd on this</b><b>because we're not a bottleneck.</b><b>We don't want to do that.</b><b>We like the shop drawing log from the</b><b>contractor to be sent to us.</b><b>And one thing, please</b><b>contractor, review the shop drawings</b><b>before you send them to us.</b><b>Right.</b><b>We want to make sure that</b><b>you guys are happy with this.</b><b>That actually isn't a proposed alternate.</b><b>It's in line.</b><b>It's actually matching</b><b>what was the specified product</b><b>and not in the same</b><b>model and all these things.</b><b>So by them doing their due diligence,</b><b>reviewing it before it comes to us,</b><b>they're probably</b><b>saving a lot of headaches.</b><b>And I bet you there's a lot of things</b><b>that we don't see happening</b><b>because they've already caught it.</b><b>And that's fantastic.</b><b>Okay.</b><b>And of course, in leading into that, no</b><b>outstanding shop drawings.</b><b>We didn't have any because</b><b>nothing has been issued to us.</b><b>But maybe there is.</b><b>Maybe there's shop</b><b>drawing one, two, three</b><b>by the time this site meeting kicks off.</b><b>Okay.</b><b>Okay.</b><b>Then we get into the</b><b>changes, you know, proposed changes.</b><b>In this case, we call them CCNs.</b><b>Just again, just talk</b><b>how we're going to do that</b><b>from a process standpoint.</b><b>Us as the lead, CRP, we will</b><b>basically put that together.</b><b>We will issue it out.</b><b>And then it goes through us.</b><b>Again, it's just a process and confirming</b><b>that between everybody.</b><b>We don't make sure</b><b>we're doing this right.</b><b>Once the contractor gets it, they're</b><b>going to provide us pricing.</b><b>We'll review it and coordinate it.</b><b>And then eventually a change order is</b><b>going to be produced.</b><b>So again, talk about your</b><b>process, how you do as a firm.</b><b>Maybe use bulletins.</b><b>That's a little bit different.</b><b>So again, this is a great</b><b>time just to kind of know</b><b>how these changes are</b><b>going to be issued out.</b><b>And basically with the change orders,</b><b>who's signing off on</b><b>it and going from there.</b><b>This is a great time to talk about is do</b><b>we have any post tender addendums?</b><b>Can we get this into the contract?</b><b>No.</b><b>Okay.</b><b>It's going to be just going to be our</b><b>first proposed change.</b><b>Great.</b><b>Okay.</b><b>Next section is RFIs.</b><b>What the RFI?</b><b>Do we have any RFIs?</b><b>Maybe we've got a survey question.</b><b>Maybe not.</b><b>Maybe in this being the</b><b>first kickoff, there's no RFI.</b><b>Great.</b><b>Let's keep going and get moving.</b><b>And now we kind of come to the point</b><b>where we've done the majority</b><b>of the heavy lifting of the meeting.</b><b>And now we're going to</b><b>go into each individual.</b><b>So any new business from the owner.</b><b>Do you have any new items, owner?</b><b>Yeah, I'm going away on holidays.</b><b>Great.</b><b>Note that.</b><b>Please CC myself, the principal, and my</b><b>two project administrators.</b><b>They really appreciate it.</b><b>Great.</b><b>We'll note that in</b><b>the meeting notes here.</b><b>Any other new business?</b><b>Just want to stress the safety of the</b><b>concerns for the children on the school.</b><b>Because this is an addition, we want to</b><b>make sure we've got the site fencing and</b><b>we want to make sure it's done well.</b><b>It's done right.</b><b>And we really want to analyze that.</b><b>This is their time to add their wish list</b><b>items based on everything we haven't</b><b>talked about already.</b><b>Once they've got done and concluded, then</b><b>basically at this point, we're going to</b><b>run into with the contractor.</b><b>Do you have any new items?</b><b>Yeah, we're pulling.</b><b>We had a trade dropout.</b><b>So now we're providing a</b><b>new revised subtrades list.</b><b>Oh, great.</b><b>Let's talk about this.</b><b>These are important things.</b><b>Any business that they</b><b>may have under architecture.</b><b>Maybe this is where we're going to note</b><b>that, you know, I'll be</b><b>leading charge of the project.</b><b>We do have Chris.</b><b>Our field reviewer is</b><b>always going to be on site.</b><b>Calm.</b><b>Here's a cell number.</b><b>Whatever the case is.</b><b>Any business that we have, anything that</b><b>before we end this</b><b>meeting, we want to get out.</b><b>Same thing for civil, structural,</b><b>mechanical, electrical.</b><b>Do they have any items that they want to</b><b>talk about and bring it to the, you know,</b><b>to the attention of the team?</b><b>Nope.</b><b>Great.</b><b>No new items.</b><b>We'll just carry on pretty</b><b>straightforward landscape.</b><b>Hey, do we need to be</b><b>part of these meetings?</b><b>No, we don't feel I will</b><b>call upon you if we need it.</b><b>We expect you to be kind of near the end</b><b>of the project when we get into planting.</b><b>Maybe the plant is going to</b><b>be phased in different phases.</b><b>Who knows, right?</b><b>It all depends on that project and we're</b><b>going to get into it.</b><b>Geotechnical.</b><b>Certainly they should be at this meeting</b><b>because we want to hear their thoughts.</b><b>Yes, we'll be outside.</b><b>We're going to review a couple of initial</b><b>lifts of the existing soil.</b><b>We want to kind of make sure it's matched</b><b>in what we noted in the report.</b><b>All these good things to</b><b>keep it moving in that respect.</b><b>Building envelope.</b><b>Call them when ready when you've got a</b><b>mock-up of the walls.</b><b>Talk about what mock-ups that you want to</b><b>see from this aspect.</b><b>Great ideas to kind of</b><b>get the conversation.</b><b>You're a long ways from it, but have the</b><b>conversations early.</b><b>Once it's all done, basically</b><b>a note with the time that end.</b><b>And then of course, note when the next</b><b>site meeting is going to be.</b><b>Great.</b><b>July 8th at 10 a.m.</b><b>On site.</b><b>Fantastic.</b><b>End of notes.</b><b>Meeting adjourned.</b><b>Save it.</b><b>Shake hands.</b><b>Go take a client out for lunch.</b><b>Whatever the case is,</b><b>you're done that site meeting.</b><b>Fantastic.</b><b>Get back to the office.</b><b>Go through your notes.</b><b>And like we talked about last site</b><b>meeting, these are all going to be 1.02.</b><b>1.02, 1.03.</b><b>And you're going to go</b><b>through and fail and shout the list.</b><b>You're going to PDF this and</b><b>you're going to send it off.</b><b>And of course, before you send it off,</b><b>make sure this doesn't say,</b><b>Jenna, that it says notes</b><b>because it is your notes now.</b><b>Save it.</b><b>Send it off.</b><b>And away you go.</b><b>Do a save as.</b><b>Put it already for the next</b><b>site meeting and get proactive.</b><b>And then start clearing out all these</b><b>items that you've closed off.</b><b>Because we're not going to do an</b><b>introduction to them.</b><b>We're not going to have</b><b>the central Dropbox items.</b><b>We've already talked about this and those</b><b>have already been concluded.</b><b>But you're going to get rid of, you know,</b><b>you will still have site safety,</b><b>but all the other stuff you're not going</b><b>to have is just really clean items.</b><b>And just for the sake of it, I'm going to</b><b>show you what that</b><b>agenda more looks like.</b><b>So now we've advanced</b><b>to meeting number two.</b><b>And you're going to see that we've got</b><b>our high level of our generals there.</b><b>We've got site safety, security, and</b><b>again, all those items</b><b>that we went into there,</b><b>we've got the schedule</b><b>progress claim shop drawings.</b><b>And the list is much shorter than that</b><b>first initial site kickoff meeting.</b><b>So again, just kind of concluding this</b><b>portion of it and why you run it.</b><b>It's really important</b><b>just to go over that.</b><b>Set the precedent.</b><b>Set the grounds.</b><b>Any questions.</b><b>Now the time's asked.</b><b>If there's any clarifications that you</b><b>need to ask due to the contract,</b><b>contractor, owner, you,</b><b>this is your time.</b><b>Just to get it all</b><b>cleaned up, ready to go.</b><b>And now we know what to</b><b>expect from the whole team.</b><b>So in closing, every site</b><b>meeting has to be tracked.</b><b>So this is important, whether it's your</b><b>first or your second or meeting 50,</b><b>we want to track it in that sense.</b><b>Highly recommend just</b><b>taking notes during a meeting.</b><b>Use your laptop.</b><b>You'll train yourself and it's great</b><b>because the moment that meeting is done,</b><b>you just do some little fine tweaking to</b><b>it, some spelling,</b><b>whatever the case is, and boom,</b><b>get it out.</b><b>Get it out there and don't wait too long.</b><b>Don't wait three, four days.</b><b>Try and get out the same day.</b><b>There's a lot of value of it and plus</b><b>it's a lot less stress off yourself.</b><b>Get it out there.</b><b>You don't have to be too detailed.</b><b>It's not a love story here.</b><b>It's just retrain your brain.</b><b>Contractor to follow up with invoices.</b><b>Contractor follow up</b><b>with revised pricing.</b><b>Waiting for revised pricing.</b><b>Waiting for mechanical.</b><b>Super simple to the point.</b><b>Put who is responsible on the action item</b><b>list there and really, really simple.</b><b>Okay.</b><b>And like I said, be sure to catch up.</b><b>The other episodes, links are in below.</b><b>Especially check out the Granola AI.</b><b>Fantastic tool that I use.</b><b>There is a free month.</b><b>Refo link helps out the show.</b><b>Keeps us being hitting the channels here.</b><b>So appreciate every of that.</b><b>But definitely check</b><b>it out because again,</b><b>this is a three part series to that.</b><b>But I hope this kind of</b><b>helps give you the confidence</b><b>and what's going to come out</b><b>at your first site meeting.</b><b>What to kind of discuss and</b><b>just go in with an agenda.</b><b>Run it like a boss and you'll</b><b>kick ass at the end of the day.</b><b>So anyhow, architects keep designing.</b><b>Contractors keep making</b><b>those blueprints reality.</b><b>We'll see on the next one.</b>