What Is Construction Management? (And How It's Different from CA)

Construction management is the builder's side of the job. Construction administration is the design team's. Mix them up and you'll be arguing about the wrong things all project long.

Mastering construction management: collaboration, efficiency and process.

THE SHORT ANSWER

Construction management (CM) is planning, coordinating and controlling a construction project: the schedule, budget, procurement, trades and site. It's done by the general contractor or a construction manager. Construction administration (CA) is the architect and design team administering the construction contract: RFIs, submittals, field reviews, changes and payment certification. Same project, different jobs.

KEY TAKEAWAYS

  • CM = how it gets built. CA = what gets built, per the contract.
  • "Construction management" is both a discipline and a delivery method.
  • On CM and developer jobs, architects often issue ASIs and the CM handles pricing with the owner.
  • Most "us vs. them" fights come from answering different questions.

What is construction management?

Construction management is the work of planning, coordinating and controlling a construction project: the schedule, the budget, procurement, the trades and the site. It's the builder's side of the job.

The term gets used two ways, and that's where the confusion starts:

  • The discipline. Every general contractor does construction management. Their PMs and superintendents run the site, the schedule, the subs and the money.
  • The delivery method. On a construction management contract, the owner hires a construction manager, often early in design, to advise on cost and constructability. They then manage the trade packages during construction. That's different from a stipulated-sum (fixed-price) job, where a general contractor bids the finished drawings.

Construction management vs. construction administration

Construction managementConstruction administration
WhoGeneral contractor or construction managerArchitect and design consultants
FocusHow it gets built: schedule, cost, means and methods, safetyWhat gets built: design intent and contract compliance
DocumentsSchedules, purchase orders, subcontracts, daily reportsRFI responses, submittal reviews, SIs, change orders, certificates for payment
On siteEvery dayField reviews at set intervals

Neither side is more important. The project needs both, and each side needs to understand the other's job.

How CM contracts change the architect's world

On a stipulated-sum job, you'll juggle SIs, CCNs and change orders, and review the contractor's pricing on every change. On a CM or developer-led job, a lot of the money conversation happens between the CM and the owner. You'll often just issue ASIs with the drawing changes and you're done. The CM prices it and the owner decides.

Same drawings, same RFIs, very different paper trail. So the first thing I do on any project is read the contract and figure out which world I'm in.

The three phases, from the builder's side

  1. Preconstruction: budgets, constructability reviews, trade packages, long-lead procurement and the baseline schedule.
  2. Construction: running the site, trades, inspections, quality control, safety, RFIs and submittals to the design team, and the monthly progress claim.
  3. Handover: testing and commissioning, occupancy, deficiencies, O&M manuals, warranties and closeout.

Why it turns into us vs. them (and how to stop it)

At the end of the day, we all want the same things: a successful project, a happy owner, fewer surprises and the repeat business that comes with it. But we come at problems from different angles.

The contractor is asking: Can this be built efficiently? Who pays for it? Is it an extra? Does it hit the critical path? The architect is asking: Does it meet code and the specs? Does it create liability? Does it keep the design intent?

Neither side is wrong. The fix is understanding the other side's questions before you answer.

WATCH

Us vs. the GC: why construction projects become adversarial

How to get back to one team, one project.

A coordination example

A rooftop unit gets substituted mid-job. For the CM, that's procurement, lead time and crane day. For the design team, it's structural loads, curb openings, electrical and whether it fits the screen. If both sides talk early, it's a two-week coordination exercise. If they don't, it's a structural RFI, a revised shop drawing, a CCN, and someone saying "nobody told me" at the site meeting.

This is exactly where one shared project record helps. In Project Arc, the contractor, architect, consultants and owner work from the same drawings, RFIs and decisions, each with their own permissions and contractual role.

BUILT BY THE HOST OF WHAT THE RFI?

One project. One team. One shared record.

Project Arc connects the general contractor, trades, architect, consultants and owner on one shared project record, carrying tender information, questions, drawings and responses into construction. Contractual responsibilities stay distinct.

  • Contractors join tender packages from one link, free
  • The same current drawings, RFIs and submittals for everyone
  • Shared information follows project roles and permissions
  • Works alongside Procore if your GC lives there

Full disclosure: I built Project Arc. One project. Every phase. projectarc.io

FAQ

Frequently asked questions

What is construction management?

Construction management is planning, coordinating and controlling a construction project: schedule, budget, procurement, trades and site operations, carried out by a general contractor or construction manager.

What is the difference between construction management and construction administration?

Construction management is the builder's work of delivering the project. Construction administration is the architect and design team administering the construction contract: RFIs, submittals, field reviews, changes and payment certification.

Is a construction manager the same as a general contractor?

Not always. A general contractor usually holds the prime contract and subcontracts. A construction manager may act as the owner's advisor or carry risk (CM at risk), depending on the contract.

Does the architect work for the construction manager?

Normally no. The architect is usually contracted directly to the owner.

Who answers RFIs on a construction management project?

The design team, as on any project. Questions about the design documents go to the architect and consultants.

How many RFIs did you get this week?

Got a CA question you want answered on the show? Send it in. Architects keep designing, contractors keep making those blueprints a reality.

How many RFIs did you get this week?

Have a Construction Administration question, a podcast topic you’d like us to cover, or are you interested in being a guest, speaking opportunity, or sponsorship? We’d love to hear from you.